Wednesday, November 10, 2010
How to install a new surface over tile.
Ready for a face lift
After the removal of unwanted walls, trenches are fill with a quick setting non-shrinking grout.
Priming:
Complete the prep. with Prime T/W, developed for resurfacing over tile or wood. During priming process a coarse sand is cast onto the surface to give a mechanical bond also for the Level 1 ..see below.
Note: the Coarse Surface
Now the surface is ready for another light prime to reactivate, and made ready for the self-level application.
Installing the Level 1
Paul Taylor AKA Beton on the screed rake
Use self-level rack set at 1/4 inch to cover the existing tile
.... Smoother
Complete the installation of the Level 1 with a smoother ,this will eliminate rack marks and leave a very smooth surface
This surface is meant only to give us a smooth base...not a finished surface
The floor will now dry for 5 days, then have an off-white Terrazzi finish applied to complete the installation .